Fixed price or hourly: how should you pay for website work?

Fixed price or hourly for website work? Who carries the risk, when each one suits, and what a fair fixed-price contract should contain before you sign.

Short answer: Pay a fixed price when the work can be described clearly in writing before it starts, such as a new site with a set number of pages or a list of known fixes. Pay hourly, or time and materials, when nobody can yet say what the work is, or when it's ongoing and changes week to week. With a fixed price the supplier carries the risk of overruns. With hourly the buyer does.

Before you hire anyone to build or fix a website, you agree how you'll pay. Most offers come in one of two shapes. Either you pay a fixed price for a defined piece of work, or you pay for the hours or days the work takes, often called time and materials. Neither is always better. The right one depends on how well you can describe the work before it starts.

What is the difference between fixed price and hourly?

With a fixed price, you agree a total for a defined result before work begins. The supplier is paid that amount whether the job takes them less time or more. Payments are usually split into stages tied to milestones, such as signed-off designs or a site ready for review.

With hourly or time and materials, you agree a rate per hour or per day. You pay for the time actually spent, usually invoiced weekly or monthly, plus any agreed costs such as licences. There is often an estimate, but the estimate isn't the price.

Who carries the risk if the work takes longer?

This is the main difference, and it's worth being clear about. The UK Government Digital Service put it plainly in its guidance for public sector buyers of digital work. Under time and materials, it said, the buyer owns more of the risk: if the work takes longer, you pay the day rate for the extra days. Under a fixed price, the supplier carries most of the risk, so costs can be higher, and it works best when requirements are well defined. That guidance has since been withdrawn, but the logic still holds.

That last point matters. A supplier who carries the risk builds some allowance for it into the price. So a fixed price can cost a little more than an optimistic hourly estimate. What you buy with the difference is certainty.

Fixed price Hourly or time and materials
Risk Mostly on the supplier. If the agreed work takes longer, they absorb it. Mostly on you. Extra hours mean a bigger bill.
Flexibility Lower. The scope is set, and changes go through a change request. Higher. You can change direction each week.
Budgeting Easy. You know the total before you start. Harder. You know the rate, not the total.
Scope changes Quoted separately and agreed in writing before work starts. Simply billed as more time.
Who pays for overruns The supplier, as long as the work stays within the written scope. You, unless the contract sets a cap.
Best for Defined projects: a new site, a redesign, a known list of fixes. Unclear or ongoing work: research, support, a product still taking shape.

When is hourly or time and materials the better choice?

Hourly is the honest choice when nobody can describe the work yet. A fixed price on unclear work is a guess, and someone pays for a bad guess. Either the price gets padded, corners get cut, or the project turns into an argument about what was included.

  • The scope is genuinely unclear. You know something is wrong with your site but not what, or you're exploring an idea that may change after the first few weeks.
  • The work is ongoing. Monthly updates, small content changes and support requests vary too much to price as one project.
  • You want to steer closely. If you'd rather decide week by week what gets built next, paying for time fits that way of working.

If you go hourly, ask for regular time reports and a point at which the supplier must stop and check with you.

When is fixed price the better choice?

  • The work can be written down. A site with a set list of pages, features and integrations. A redesign of an existing site. A list of problems from an audit.
  • You have a fixed budget. Most small businesses do. Knowing the total lets you plan, and you won't be surprised by the final invoice.

Is there a middle ground?

Yes, and it's often the most sensible option.

  • Capped time and materials. You pay for time, but with a ceiling. The Government Digital Service guidance described this too: if the cap is reached before the work is finished, the supplier completes it at their own cost, and if they finish early, you pay only for the time taken.
  • A small first step, then a fixed price. Pay for a short audit or discovery phase that turns an unclear problem into a written list of work. Then agree a fixed price for that list. You get flexibility where the unknowns are, and certainty for the build.

What should a good fixed-price contract contain?

A fixed price is only as good as the document behind it. Guidance from the UK Office of the Small Business Commissioner, published through Business Gateway, says a contract should set out who the parties are, exactly what is being supplied, how long it runs, how and when payment is made, and how the contract ends. For website work, check for these in particular:

  • Scope. The pages, features, integrations and content, listed. Also what is not included, such as copywriting, photography or hosting.
  • Milestones and payments. Payments linked to visible stages, not dates. Be wary of paying most of the total before you've seen any work.
  • Change requests. How changes outside the scope are handled. A good answer is that each change is quoted in writing and you approve it before anyone works on it.
  • Revisions. How many rounds of design changes are included, so neither side argues later about what "a few tweaks" meant.
  • Acceptance. How you sign off each stage, how long you have to check it, and what happens to bugs found after launch.
  • Ownership. Who owns the design, code and content when you've paid. Under UK copyright guidance from the Intellectual Property Office, when you commission a work, the person who created it is the first legal owner unless you agree otherwise in writing. So ask for ownership to transfer to you in the contract.
  • Ending early. What you pay and what you receive if the project stops halfway.

How do we price our own work?

We're a two-founder studio, and almost everything we do is fixed price, with the prices published. Our terms follow the list above: a written scope before work starts, payments in three parts of 40%, 30% and 30% tied to milestones, three rounds of design revisions, a 30-day warranty on bugs after launch, and anything outside the scope quoted separately before we do it.

We don't think fixed price suits everything. When a problem isn't clear yet, we start with a small paid audit, which gives both sides a written list of what needs doing. Only then do we put a fixed price on the work.

What should you ask before you sign?

  1. Is this a fixed price or an estimate?
  2. What exactly is included, and what isn't?
  3. How are changes quoted and approved?
  4. What do I pay at each stage, and what do I see before each payment?
  5. How many rounds of revisions are included?
  6. What happens if something breaks after launch?
  7. Who owns the design and code once I've paid?

Sources

If you're still working out a budget, what a website costs goes through the main price ranges and what drives them. Our own fixed prices, from the $49 audit to a full redesign, are on the pricing page.

Related service

Keep reading

Tell us what the site or app has to do.

Book a free call

Free 30-minute call · No obligation · Reply within 24h

Not ready for a call? Get a free website check, a $49 website and SEO audit, or write to us from the contact page.